Page 1 of 4 1234

Past Projects

 
Daly's Construction required our services to break rock in a 30 mtr trench, the project was in a very sensative area of Richmond a suburb in Melbourne...
We were engaged to sink a 105 mtr internal shaft 6.1 mtrs diameter, in a very sensative area underground, the project was to drill and blast the...
Perfect Shafts is contracted to develop the narrow vein ore bodies. All the work is carried out by hand held operation and removal of mullock is...
We were contracted to construct a fan station underground, project involved setting up form work, installation of reo and concrete footings .Fans...
Using Cardox, Excavated 120m3 of pink Granite in a sensitive area in the heart of Townsville for development of units on Castle hill. 
Development of 60 mtr Egress tunnel in the Brisbane Mall to be used as a exscape way for the bus tunnel, the project was in a very sensative area...
Development of 40 mtr walkway tunnel under 6mtrs of road at the casino end in Brisbane,project was successfully comleted using Cardox, no permits...
Development of 22mtr shaft in the heart of Brisbane in a heritage area , Cardox was used to complete this project, no permits or Licences were required. 
Supply labour for the development of 14mtr shaft for McConnell Dowell in the heart on the Brisbane river for the sewer up grade. 
Project was to Sink a 16mtr elevator shaft in a heritage building in the mall of Brisbane city, the method that we used was to excavate the rock...
 