Page 3 of 4 1234

Past Projects

 
Excavate rock for sewage upgrade Townsville army base 
Cardox was used to excavate dyke from UG development at Central Colliery Coal Mine, 
The services and methane line was not disturbed. No permits...
Variety of scaffolding projects throughout Qld, from high rise buildings to shut down projects, 
Supply water truck to Copper Bella Coal Mine Nth Queensland, for road construction 
Removel of sandstone over the coal seam, excavated material 200m3 of Sandstone using Cardox no permits or licences required. 
Cardox was used to unblocked a phosphate Silo, 4 tubes were inserted at the base of the silo and activate 
Drill Anchor bolt holes to support the new extension to the Burdekin Dam upgrade Project Nth Queensland 
Install underground de-watering pumping stations in the sulamin decline to dewarter the old workings at Ballarat Gold Fields Mine vic 
Install and grout 6mtr Anchor Bolts under the main road, for stabilization client Water Matters 
Drill 300 - 2mtr anchor bolt holes in the existing wall for dam extensions Lake Manchester Dam Brisbane 
 
© 2008 Perfect Shafts, All Rights Reserved
Site Design and Hosting by: Internet Solutions Pty Ltd